Valley Range is proposed on non-irrigated rangeland that has been uneconomic for ag-related production. The proposed layout includes hundreds of acres of conservation areas, large setbacks from neighboring properties, and approximately 80 acres of wildlife corridors to help maintain wildlife movement through the area. Accelergen has consulted with Colorado Parks and Wildlife in developing the project and adopted CPW suggestions on project layout. Valley Range construction is expected to last 12 months; after construction, there will be an expected six vehicle trips per day from the two access roads off of Hwy 160.
Valley Range Energy Park
The proposed design includes lithium iron phosphate (LFP) batteries, a 24/7 battery management system, large scale fire tested (LSFT) containers, internal temperature controls, protective shutdown systems, and measures intended to limit danger if there is an equipment failure. The Cortez Fire Department, other Montezuma County fire departments, and the Office of Emergency Management are participating in developing the Emergency Response Guide and will receive regular classroom and in-person training.
No. Valley Range is not being developed to serve a data center, mining operation, or another large-load development. The current planned production is being purchased by participating Colorado co-ops to supply their memberships through Tri-State’s BYOR program.
Valley Range offers the electric cooperative partnership an estimated savings totaling more than $20 million, which will assist in slowing rate increases for local families and businesses.
The support of Montezuma County residents is essential to Valley Range being permitted. Please sign a letter of support and speak in support of Valley Range at the planning commission and board of county commissioner hearings.
Accelergen commits to remove project equipment and restore the site under a decommissioning plan, completely backed by a decommissioning bond that is held by a reputable third party for the benefit of Montezuma County and is regularly evaluated to ensure it could finance full decommissioning.
BYOR is a Tri-State program that allows participating cooperatives to contract for energy resources while continuing to receive wholesale service from Tri-State. Tri-State integrates the project’s output into its system and credits participating cooperatives under the program’s agreements.
Yes. The participating co-ops will purchase power through Tri-State’s Bring Your Own Resource (BYOR) program. Valley Range will connect to Tri-State and will benefit its member co-ops.
Battery energy storage systems (BESS) allow electricity to be stored and delivered when needed and to levelize costs during peak demand. While the solar generates additional electricity, the BESS gives Tri-State an important resource to help meet demand when member co-ops need it.
Valley Range will provide a low-risk source of long-term revenue while supporting affordability and reliability for our members. The co-ops’ interest in the project is based on the economic value it will provide to members by reducing upward rate pressure plus the addition of more renewable power to their supply portfolio.