- The GCEA electrical system is 25% loaded on average
- We have plenty of room to grow, the system was designed for growth in our area
- Tri-State is developing more renewable energy projects to meet forecasted demand with clean energy
- 255 MWs of solar being installed in Colorado by 2024
- 200 MWs of solar also being installed in New Mexico in 2024
- 280 MWs or solar being installed in Colorado by 2025
- Electrification is happening, but not all at once and not overnight, so we have time to plan, much like when people started using air conditioners