- Determine project scope, budget, funding mechanism, and timeline using the following considerations:
- Determine ideal project site, based on existing infrastructure and infrastructure needs
- Determine the type and costs of charging equipment needed, typically a Level 2 station
- Decide whether the stations will need to be networked, including if utilization data will be collected and if payment capabilities are necessary
- Determine if a formal solicitation is needed
- Choose a network and/or charging infrastructure manufacturer and provider
- Identify installation needs and costs and find a certified electrical contractor
- Apply for grant funding, rebates, and tax credits
- Obtain required permits
- Determine additional site needs, including signage and security
- Assess charging infrastructure maintenance and operation needs and costs
- Confirm the station is included on EV station finding apps, like www.plugshare.com